« back to gallery
« »
Baku, Azerbaijan <br />
December 12, 2006<br />
<br />
Carpet factory.<br />
<br />
Baku and Azerbaijan in general should benefit financially from the new oil and gas pipeline that will soon carry as much as 1 million barrels of oil a day into Europe via the Baku-Tbilisi-Ceyhan pipeline. The 1,776 km, $4 billion pipeline places the gas and oil directly into Europe by-passing Russia for the first time.

Details

BTC Oil Pipeline 2006
Baku, Azerbaijan
December 12, 2006

Carpet factory.

Baku and Azerbaijan in general should benefit financially from the new oil and gas pipeline that will soon carry as much as 1 million barrels of oil a day into Europe via the Baku-Tbilisi-Ceyhan pipeline. The 1,776 km, $4 billion pipeline places the gas and oil directly into Europe by-passing Russia for the first time.

Filename: 12_2006_btc_pipeline_070.jpg
From gallery: BTC BW 2006
Photographer: ARCHIVE ANTHONY SUAU
Source: Anthony Suau © 2006
Date 12 Dec 2006
Location: Baku Azerbaijan
Credit: Anthony Suau
Copyright: Anthony Suau 2006
Model Release: No
Property Release: No
Restrictions: Minimum usage fee $300 US or 250 Euro
Direct Link:
Keywords:
  • Anthony Suau
  • Caspian Sea
  • Baku
  • Azerbaijan
  • December 12
  • 2006
  • oil
  • pipeline
  • Europe
  • Baku-Tbilisi-Ceyhan pipeline
  • BTC
  • 1776 km
  • $4 billion
  • Russia
  • Turkey
  • Georgia
  • British Petroleum
  • rich
  • carpet factory
  • carpets
  • carpet

Only search this gallery