Image 1 of 1
12_2006_btc_pipeline_012.jpg
Sangachal, Azerbaijan
December 11, 2006
Sangachal British Petroleum gas and oil terminal that feeds from their off-shore rigs to the newly constructed pipeline to the Baku-Tbilisi-Ceyhan pipeline (BTC).
A man tests the automatic function of a value just hours before the first gas from an Azeri off-shore rig is pumped down the new pipeline to Europe.
December 11, 2006
Sangachal British Petroleum gas and oil terminal that feeds from their off-shore rigs to the newly constructed pipeline to the Baku-Tbilisi-Ceyhan pipeline (BTC).
A man tests the automatic function of a value just hours before the first gas from an Azeri off-shore rig is pumped down the new pipeline to Europe.
- Copyright
- Anthony Suau 2006
- Image Size
- 3975x2622 / 4.6MB
- Contained in galleries
- BTC BW 2006