Image 1 of 1
12_2006_btc_pipeline_070.jpg
Baku, Azerbaijan
December 12, 2006
Carpet factory.
Baku and Azerbaijan in general should benefit financially from the new oil and gas pipeline that will soon carry as much as 1 million barrels of oil a day into Europe via the Baku-Tbilisi-Ceyhan pipeline. The 1,776 km, $4 billion pipeline places the gas and oil directly into Europe by-passing Russia for the first time.
December 12, 2006
Carpet factory.
Baku and Azerbaijan in general should benefit financially from the new oil and gas pipeline that will soon carry as much as 1 million barrels of oil a day into Europe via the Baku-Tbilisi-Ceyhan pipeline. The 1,776 km, $4 billion pipeline places the gas and oil directly into Europe by-passing Russia for the first time.
- Copyright
- Anthony Suau 2006
- Image Size
- 3975x2656 / 2.7MB
- Contained in galleries
- BTC BW 2006